Wow, we're late with the pictures! We take photos each day but Markus only posts them on Facebook and we haven't had much time to update the blog. We had an Election Night party, a day of recovery, and a neighborhood party this weekend.

The bathroom is progressing. We didn't order enough bullnose tile initially because our design changed after we started construction. They're special order tiles so some things can't be finished (like the toilet) until after the bullnose is in and installed. Anyway, the shower and tub are now tiled and all of the tile is grouted. We are meeting with the glass guy tonight for the shower door, and I think the marble for the counter and shower base and thresholds has been ordered. Soon, soon, I think we will be done! Oh yeah, they're supposed to paint this week, too.

If you don't feel like looking at all of these, the best ones that show most of the bathroom and capture what it looks like right now are in the Day 16 album.

For now, here are links to the days 8 - 16 (current):

10/31 - Day 8:

20081031 - 2nd Floor Bathroom Day 8 (Friday)


11/1 - Day 9:
20081101 - 2nd Floor Bathroom Day 9 (Saturday)
#

11/3 - Day 10:
20081103 - 2nd Floor Bathroom Day 10 (Monday)


11/4 - Day 11:
20081104 - 2nd Floor Bathroom Day 11 (Tuesday)


11/5 - Day 12: This is the only picture.
From 20081105 - 2nd Floor Bathroom Day 12 (Wednesday)


11/6 - Day 13:
20081106 - 2nd Floor Bathroom Day 13 (Thursday)


11/7 - Day 14: This is the only picture.
From 20081107 - 2nd Floor Bathroom Day 14 (Friday)


11/8 - Day 15:
20081108 - 2nd Floor Bathroom Day 15 (Saturday)


11/10 - Day 16:
20081110 - 2nd Floor Bathroom Day 16 (Monday)


11/11 - Day 17: This is the only picture.
From 20081111 - 2nd Floor Bathroom Day 17 (Tuesday)

0 comments: